KUWAIT INTERNATIONAL AIRPORT TERMINAL 2
TD phase
CD phase:
Location:
Year:
GBA:
Client:
My role:
Kuwait International Airport Terminal 2 construction started in 2016 by Limak Construction as the main contractor of the project. Terminal 2 has an entirely bespoke design from the main structure to the building enclosure and also the interior constructions. Construction design and BIM teams from many countries were involved in addition to the specialist sub-contractors both local and international. Particularly the facade and roof systems features an extremely complicated design with the integration of sun shading system to the facade and bespoke skylight funnel system to the roof.
My role was to manage the design works for both the facade and roof systems in addition to the access and maintenance strategy coordination in liaison with the Engineer's Representatives, Sub-contractors and the main contractor's teams.
Foster + Partners
Arup-Gulf Consult
Aecom
Werner Sobek
KUWAIT
2018-2022
720K m²
Ministry of
Public Works
Facade & Roof
Design Manager
ISTANBUL
AIRPORT
TERMINAL 1
SD phase
DD phase:
CD phase:
Location:
Year:
GBA:
Client:
My role:
Designed as a transportation hub, Istanbul Airport T1 is among the largest construction projects of the world. Custom designed unitized CWS , stick system CWS . dome skylight systems and modular roof steel structure system with a vaulted ceiling , each being large spanning enclosures are developed in collaboration with teams of designers and engineers which was an intricate process due to design-build concept of the construction.
My role was the design and coordination of the facade and roof systems, beside vaulted ceilings ,and BMU system at the design development phase which is executed via BIM platforms. Further, shop drawing coordination between the sub-contractors and shop drawing reviews for the entire building enclosure are accomplished.
Nordic - Haptic
Grimshaw
Scott Brownrigg
Fonksiyon
Fonksiyon
İSTANBUL
2015-2018
1.4 M m²
IGA
Facade & Roof
Design Coordinator
KEMPEGOWDA
AIRPORT
TERMINAL 2
TD phase
Location:
Year:
GBA:
Client:
My role:
Kempegowda Airport had been tendered for construction in 2018 by BIAL (Bangalore International Airport Limited)
My role was to assist the confidential top tier bidder company at the bidding stage through my architectural services including the cost estimation and quotation in liaison with potential vendors, BIM model review and BOQ extraction, coordination with the vendors ,design review and reporting until the end of bidding stage.
SOM
Bengalore INDIA
2018-2018
200k m²
Confidential
Bid Stage
Support
FERKO SIGNATURE
OFFICE TOWER
DD phase:
CD phase:
Location:
Year:
GBA:
Client:
My role:
Ferko Signature office tower placed at Buyukdere street which is the CBD of İstanbul at european side.My role was to coordinate the architectural construction projects within an interdisciplinary colloboration and manage the team to prepare all architectural construction document set.BIM modelling techniques were used in all phased of the project.
Foster+Partners
kr2b
Levent İSTANBUL
2013-2015
100000m²
Ferko
Construction
Project
Coordinator
MART RETAIL
CENTER
DD phase:
CD phase:
Location:
Year:
GBA:
Client:
My role:
Mart Retail Center has been designed as a modern interpretation of the local building reliefs. Solid brick cavity walls at exterior enclosure give the specific character to the bilding. .My role was to proceed the conservations with local authorities while coordinating the architectural design development projects within an interdisciplinary colloboration and manage the team to prepare all expertise document set.The construction details and tender documents were also done by the same team.BIM modelling techniques were used in all phased of the project.
kr2b
kr2b
Taraz Kazakhstan
2013-2015
60000m²
Alto Partners
Project
Coordinator
BOMONTI HOTEL&
CONGRESS CENTER
SD phase:
DD phase:
Location:
Year:
GBA:
Client:
My role:
The project has a mix-used program also including the retail areas recrated upon existing Bomonti Beer Factory, a landmark in the region called Bomonti. I have contributed to DD phase including the permit project documents submitted to Metropolitan Municipality of Istanbul.
Atkins
Lineatusavul
Sisli Istanbul
2008
200000m²
IC Holding
Project
Architect
BURSAGAZ
HEAD OFFICE
SD phase:
CD phase:
Location:
Year:
GBA:
Client:
My role:
Tago
Tago
Bursaa
2012
10000m²
Bursagaz
Project
Coordinator
Designed as the head office to a major energy provider company, the building is an initiative project with having BIPV (Building Integrated Photo Voltaic) systems integrated into both facade and roof.
With its double skin facade of which the outer skin is composed of an irregularly distributed BIPV modules, creates a shaded semi-open balcony area surrounding the indoor working spaces and further provides a sun controlled break area for the occupants.
An event terrace is designed at the roof top with a shelter composed of PV panels where a wind tribune is also placed. My role was the construction design documentation and interdisciplinary coordination covering the DD and CD phases.
TAEGUTEC HEAD OFFICE & FACTORY
SD phase:
CD phase:
Location:
Year:
GBA:
Client:
My role:
;The building is designed for a Korean origined micro robot company Taegutec that wanted to house its activities in a unique atmosphere. Design of the building express the strength and challenging position of the internationally operating corporation. Brutal concrete cantilevering meeting hall is the spot point of the building.My role was to manage the design process according to customers needs and create the design development and construction documents including tender package.
Tago
Tago
Gebze Izmit
2011
3000m²
Taegutec
Inc
Project
Coordinator
KIRSEHIR
BUS TERMINAL
SD phase:
CD phase:
Location:
Year:
GBA:
Client:
My role:
The iconic design of the terminal building serves as a monovolume space inside. 10 meters cantilevering concrete shell canopies shelters arrival and pick-up perons.White enclosure surface is obtained by white GRC cladding panels. My role was to coordinate the disciplines and produce the tender package architectural documents.
Tago
Tago
Kirsehir
2011
4500m²
Kirsehir
Municipality
Project
Coordinator
RESIDENCE TOWER
KOZYATAGI
SD phase:
CD phase:
Location:
Year:
GBA:
Client:
My role:
40 storey residence block is designed as a mass expressing a dramatic contrast between horizontal and vertical.My role was to draw the permit projects according to high rise buliding codes.
Tago
Tago
ıIstanbul
2012
50000m²
Buyukhanlı
Group
Project
Coordinator
HOTEL BLOCK
KONYA
SD phase:
CD phase:
Location:
Year:
GBA:
Client:
My role:
40 storey residence block is designed as a mass expressing a dramatic contrast between horizontal and vertical.My role was to draw the permit projects according to high rise buliding codes.
Tago
Tago
Konya
2012
8000m²
Deha Group
Project
Coordinator
PERISSIA HOTEL
EXTENSION
BRIDGE
Contractor
Location:
Year:
Value
Client:
My role:
Extension bridge and restauranr of the existing hotel is constructed with steel deck and roof. Construnction is completed in 2 months.