top of page

KUWAIT INTERNATIONAL AIRPORT  TERMINAL 2

 

TD phase
 
CD phase:

Location: 
Year:        
GBA: 
Client:
 

My role:

Kuwait International Airport Terminal 2 construction started in 2016 by Limak Construction as the main contractor of the project. Terminal 2 has an entirely bespoke design from the main structure to the building enclosure and also the interior constructions. Construction design and BIM teams from many countries were involved in addition to the specialist sub-contractors both local and international. Particularly the facade and roof systems features an extremely complicated design with the integration of sun shading system to the facade and bespoke skylight funnel system to the roof. 

My role was to manage the design works for both the facade and roof systems in addition to the access and maintenance strategy coordination in liaison with the Engineer's Representatives, Sub-contractors and the main contractor's teams.   

Foster + Partners
Arup-Gulf Consult
Aecom
Werner Sobek

KUWAIT
2018-2022
720K m² 
Ministry of
Public Works


Facade & Roof
Design Manager

ISTANBUL

AIRPORT

TERMINAL 1

 

SD phase

 

DD phase:

CD phase:

Location: 

Year:        

GBA: 

Client:

 

My role:

Designed as a transportation hub, Istanbul Airport T1 is among the largest construction projects of the world. Custom designed unitized CWS , stick system CWS . dome skylight systems  and modular roof steel structure system with a vaulted ceiling , each being large spanning enclosures are developed in collaboration with teams of designers and engineers which was an intricate process due to design-build concept of the construction.

My role was the design and coordination of the facade and roof systems, beside vaulted ceilings ,and BMU system at the design development phase which is executed via BIM platforms. Further, shop drawing coordination between the sub-contractors and shop drawing reviews for the entire building enclosure are accomplished. 

Nordic - Haptic

Grimshaw

Scott Brownrigg

Fonksiyon

Fonksiyon

İSTANBUL

2015-2018

1.4 M m² 

IGA

Facade & Roof

Design Coordinator

KEMPEGOWDA

AIRPORT

TERMINAL 2

 

TD phase
 
Location: 
Year:        
GBA: 
Client:
My role:

Kempegowda Airport had been tendered for construction in 2018 by BIAL (Bangalore International Airport Limited) 

My role was to assist the confidential top tier bidder company at the bidding stage through my architectural services including the cost estimation and quotation in liaison with potential vendors, BIM model review and BOQ extraction, coordination with the vendors ,design review and reporting until the end of bidding stage.  

SOM

Bengalore INDIA
2018-2018
200k m² 
Confidential
Bid Stage
Support

 

FERKO SIGNATURE

OFFICE TOWER

 

DD phase:

CD phase:

Location: 

Year:        

GBA: 

Client:

 

 

My role:

Ferko Signature office tower placed at Buyukdere street which is the CBD of İstanbul at european side.My role was to coordinate the architectural construction projects within an interdisciplinary colloboration and manage the team to prepare all architectural construction document set.BIM modelling techniques were used in all phased of the project.

Foster+Partners

kr2b

Levent İSTANBUL

2013-2015

100000m² 

Ferko

Construction

 

Project

Coordinator

MART RETAIL

CENTER

 

DD phase:

CD phase:

Location: 

Year:        

GBA: 

Client:

 

 

My role:

Mart Retail Center has been designed as a modern interpretation of the local building reliefs. Solid brick cavity walls at exterior enclosure give the specific character to the bilding.  .My role was to proceed the conservations with local authorities while coordinating the architectural design development projects within an interdisciplinary colloboration and manage the team to prepare all expertise document set.The construction details and tender documents were also done by the same team.BIM modelling techniques were used in all phased of the project.

kr2b

kr2b

Taraz Kazakhstan

2013-2015

60000m² 

Alto Partners

 

 

Project

Coordinator

BOMONTI HOTEL&

CONGRESS CENTER

 

SD phase:

DD phase:

Location: 

Year:        

GBA: 

Client:

 

 

My role:

The project has a mix-used program also including the retail areas recrated upon existing Bomonti Beer Factory, a landmark in the region called Bomonti. I have contributed to DD phase including the permit project documents submitted to Metropolitan Municipality of Istanbul. 

Atkins
Lineatusavul
Sisli Istanbul
2008
200000m² 
IC Holding
 
 
Project
Architect

BURSAGAZ

HEAD OFFICE

SD phase:

CD phase:

Location: 

Year:        

GBA: 

Client:

 

 

My role:

Tago

Tago

Bursaa

2012

10000m² 

Bursagaz 

 

 

Project

Coordinator

Designed as the head office to a major energy provider company, the building is an initiative project with having BIPV (Building Integrated Photo Voltaic) systems integrated into both facade and roof. 

With its double skin facade of which the outer skin is composed of an irregularly distributed BIPV modules, creates a shaded semi-open balcony area surrounding the indoor working spaces and further provides a sun controlled break area for the occupants. 

An event terrace is designed at the roof top with a shelter composed of PV panels where a wind tribune is also placed. My role was the construction design documentation and interdisciplinary coordination covering the DD and CD phases.

TAEGUTEC HEAD OFFICE & FACTORY

SD phase:

CD phase:

Location: 

Year:        

GBA: 

Client:

 

 

My role:

;The building is designed for a Korean origined micro robot company Taegutec that wanted to house its activities in a unique atmosphere. Design of the building express the strength and challenging position of the internationally operating corporation. Brutal concrete cantilevering meeting hall is the spot point of the building.My role was to manage the design process according to customers needs and create the design development and construction documents including tender package.

Tago

Tago

Gebze Izmit

2011

3000m² 

Taegutec

Inc

 

Project

Coordinator

KIRSEHIR

BUS TERMINAL

SD phase:

CD phase:

Location: 

Year:        

GBA: 

Client:

 

 

My role:

The iconic design of the terminal building serves as a monovolume space inside. 10 meters cantilevering concrete shell canopies shelters arrival and pick-up perons.White enclosure surface is obtained by white GRC cladding panels. My role was to coordinate the disciplines and produce the tender package architectural documents.

Tago

Tago

Kirsehir

2011

4500m² 

Kirsehir

Municipality

 

Project

Coordinator

RESIDENCE TOWER

KOZYATAGI

SD phase:

CD phase:

Location: 

Year:        

GBA: 

Client:

 

 

My role:

40 storey residence block is designed as a  mass expressing a dramatic contrast between horizontal and vertical.My role was to draw the permit projects according to high rise buliding codes.

Tago

Tago

ıIstanbul

2012

50000m² 

Buyukhanlı

Group

 

Project

Coordinator

HOTEL BLOCK

KONYA

SD phase:

CD phase:

Location: 

Year:        

GBA: 

Client:

 

 

My role:

40 storey residence block is designed as a  mass expressing a dramatic contrast between horizontal and vertical.My role was to draw the permit projects according to high rise buliding codes.

Tago

Tago

Konya

2012

8000m² 

Deha Group

 

Project

Coordinator

PERISSIA HOTEL

EXTENSION

BRIDGE 

Contractor

Location: 

Year:        

Value 

Client:

 

 

My role:

Extension bridge and restauranr of the existing hotel is constructed with steel deck and roof. Construnction is completed in 2 months.

Atak Engineering

Antalya

2005

110000$

Diana Group

 

Site

Manager

bottom of page